h2euplusstore - Start

Project Map and Timetable

 

Timetable
 

 

  • Phase 1 (2021 - 2030): Realization of 2.5 TWh/a H2
  • Phase 2 (2031 - 2040): Increase to 40 TWh/a H2 by 2040
  • Phase 3 (2041 - 2050): Increase to 80 TWh/a H2 by 2050


The project is structured in three phases and is timed to match with the development of new photovoltaic, wind and electrolysis capacity in Ukraine and the conversion of transport infrastructure and storage facilities in Central Europe.

Downloads